Skip to content
Fieldstone.

Cost tool

Bathroom Remodel Cost Calculator

The plumbing question is the one that matters most. Keeping fixtures where they are can cut a bathroom project by a third, and in a slab-on-grade house the difference is larger still.

No town pages are live yet in this state.

The single largest cost variable in any bathroom. In a slab-on-grade house it means cutting concrete.

5 by 8 is the dominant footprint in this housing stock.

Cast iron waste is standard in anything built here before about 1960. Choose unknown if you are not sure.

Additional options

Estimated tub to shower conversion

$8,400to$11,200

Working days on site

5 to 9 days

Working days, so a 20 day project is roughly a month on the calendar. If this is your only bathroom, ask for the toilet to be back in service overnight.

Tub to shower conversion, standard 5x8, 40 to 60 sq ft
$9,500
Get quotes for this bathroom

Ranges are estimates for this market based on typical scope. They are not quotes. Actual pricing depends on the house, access, and what turns up once work starts.

Cost data reviewed 2026-09-01

How this is calculated

The project type sets a base figure, which is then scaled by bathroom size and finish level. Additions follow for plumbing relocation, waste and supply pipe replacement, and second floor access. Then the geographic adjustments apply, state first and region second, and the housing stock modifiers last.

The timeline is drawn from typical scope rather than calculated, and it is given in working days. A 20 working day project is roughly a month on the calendar. Timeline is frequently the deciding factor in a one bathroom house and almost nobody in this market publishes it.

What this tool cannot know

Every one of these matters to the final number and none of them can be read off a form. They are the reason the output is a range and the reason a contractor still has to look at the house.

  • What the floor framing under the bathroom looks like, which determines whether a curbless shower is possible
  • Whether there is a slow leak that has already compromised the subfloor, which is common and is repaired before anything else
  • Whether the house is on a slab or over a basement, which changes the cost of moving a fixture by thousands
  • What is inside the wall, which in pre-1960 housing here is frequently cast iron and sometimes galvanised

Common questions

Because it is the most requested bathroom project in this region, and because the 5 by 8 footprint it usually happens in is the dominant bathroom size in postwar capes, ranches, and three-decker units across all three states.